
Consider continuity across the whole system
In a data centre, the main supply, backup and loads need to be assessed together. We review the available sources and the continuity requirements defined for the facility.
The assessment informs measurement, power quality or switching measures in the context of the existing infrastructure and operating criteria.
Three priorities for availability
Servers and IT loads
Electrical losses, harmonics and imbalance can affect critical equipment performance.
Cooling
Overheating and poorly optimised cooling increase consumption and operational risk.
Power distribution
Consumption and redundant systems should be assessed together.
Beyond consumption indicators
IEQSY’s published technical analysis highlights brief disturbances, harmonic loading of the neutral and transfers between sources. Reviewing UPS, generator and switching coordination helps explain risks that an aggregate consumption indicator cannot describe.
Planning the intervention
Measure
Locate losses and record electrical behaviour.
Define
Prioritise cooling, distribution and disturbance correction.
Verify
Integrate the measures and monitor results.
Prepare your facility assessment
Identify priority loads and processes, recorded incidents, and supply and backup sources. That information defines the measurements, intervention scope and how results will be checked.
Your next step starts here.
Tell us how we can help. We welcome enquiries about our solutions, services, support and partnerships.