Sectors
Sectors

Data centres

Continuity begins with the power supply.

Request an assessment
Conceptual illustration of a data centre aisle lined with server racks.

Consider continuity across the whole system

In a data centre, the main supply, backup and loads need to be assessed together. We review the available sources and the continuity requirements defined for the facility.

The assessment informs measurement, power quality or switching measures in the context of the existing infrastructure and operating criteria.

Three priorities for availability

01

Servers and IT loads

Electrical losses, harmonics and imbalance can affect critical equipment performance.

02

Cooling

Overheating and poorly optimised cooling increase consumption and operational risk.

03

Power distribution

Consumption and redundant systems should be assessed together.

Beyond consumption indicators

IEQSY’s published technical analysis highlights brief disturbances, harmonic loading of the neutral and transfers between sources. Reviewing UPS, generator and switching coordination helps explain risks that an aggregate consumption indicator cannot describe.

Planning the intervention

01

Measure

Locate losses and record electrical behaviour.

02

Define

Prioritise cooling, distribution and disturbance correction.

03

Verify

Integrate the measures and monitor results.

Prepare your facility assessment

Identify priority loads and processes, recorded incidents, and supply and backup sources. That information defines the measurements, intervention scope and how results will be checked.

Explore engineering services

Let’s talk

Your next step starts here.

Tell us how we can help. We welcome enquiries about our solutions, services, support and partnerships.

Request an assessment